LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 251|回复: 0
打印 上一主题 下一主题

Building permit fees for a project are what type of cost?

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-21 16:19:09 |只看该作者 |正序浏览
试卷: LEED GA模拟题B[查看]
Building permit fees for a project are what type of cost?
A: Soft cost
B: Life cycle cost
C: Operating cost
D: Hard cost

参考答案: A

本题解释:
A soft construction cost is one that is not directly related to building, construction, etc. These include building permit fees, architect fees, legal, financing, engineering fees, commissioning, and other costs incurred before and after construction;Life cycle costing (LCC) is the evaluation of the total cost of a building or product over its useful life, including initial, maintenance, repair and replacement costs as well as savings. LCC evaluates economic performance; Operating costs are another type of cost for a building in addition to hard and soft costs. These costs occur after the building is complete and up and running. These costs include utilities such as water and electricity as well as the costs of maintenance personnel - janitorial, landscape, security; Hard costs: By far the largest portion of the expenses in a construction budget, the hard costs are mostly comprised of the actual construction costs incurred to build the project.

Examples include masonry, wood, steel, carpet, tile, mechanical systems, roofing.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 11:43 , Processed in 0.082485 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部