试卷: WELL AP v2模拟题 A卷[查看] In an urban high-rise building, a contractor is preparing to begin construction on a 10,000 ft2 (930m2) tenant suite. The team is preparing to use a combination of strategies during construction to mitigate the risk of construction pollution to the tenant suite. Envelope protection and filter replacement are some of the strategies that can be used. What is another strategy that can be used during construction to reduce the risk of construction pollution?在一座城市高层建筑中,承包商正准备开始建造 10,000 平方英尺(930 平方米)的租户套房。该团队正准备在施工期间使用组合策略来降低施工污染对租户套房的风险。围护结构保护和过滤器更换是其中一些可以使用的策略。在施工过程中还可以采用什么策略来降低施工污染风险? A: Envelope sizing围护结构尺寸 B: Humidity management湿度管理 C: Retrocommissioning 重新调试 D: Moisture and dust managemen潮湿和粉尘管理 参考答案: D |
|