LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 161|回复: 0
打印 上一主题 下一主题

In an existing reconstruction project, there are old water facilities in the pro

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2020-8-27 09:36:29 |只看该作者 |正序浏览
试卷: LEED v4 BD+C英文模拟题(B)[查看]
In an existing reconstruction project, there are old water facilities in the project, and there are also water facilities added during the transformation process. When is the indoor water saving amount calculated?
A: . Old water facilities are not counted
B: The old water facilities only need to achieve 80% water saving rate
C: Only 20% of the old facilities are needed
D: A new and old standard

参考答案: D
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-28 06:48 , Processed in 0.074464 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部