LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 593|回复: 0
打印 上一主题 下一主题

The project team is discussing commissioning activities in a pre-design meeting

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:31:43 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
The project team is discussing commissioning activities in a pre-design meeting to help determine a target certification level. What additional tasks will the commissioning authority need to perform for enhanced commissioning?
A: Conduct a design review prior to producing mid-construction documents
B: Complete a summary commissioning report
C: Develop a Basis of Design
D: Verify installation and performance of systems

参考答案: A

本题解释:
Notes:

Reference: Energy and Atmosphere Credit, Enhanced Commissioning, Requirements

See the requirements for a complete list of the six additional activities required for this credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 19:34 , Processed in 0.072424 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部