LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 300|回复: 0
打印 上一主题 下一主题

The project owner has designated you to hire the Enhanced Commissioning Authorit

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 15:38:06 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
The project owner has designated you to hire the Enhanced Commissioning Authority for a 100,000 sq. ft. office space. What are the restrictions to follow to ensure the CxA qualifies?
A: The CxA must have building experience on at least 3 other building projects
B: The CxA cannot be an employee of a contractor or construction manager holding construction contracts
C: The CxA cannot be an employee or contractor of the owner
D: The CxA must not be a contracted employee through the design firm

参考答案: B

本题解释:
See EA Prerequisite 1, Table 3

For fundamental commissioning buildings that are < 50,000 sf can have additional parties acting as the CxA compared to a building larger than 50,000 sf. Check Table 3 in the reference guide for a complete list.

The CxA must:

- be independent of the design and construction work
- not be an employee of the design firm
- not be an employee of or contracted by a contractor holding construction contracts

The CxA can be an employee or consultant to the owner
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:20 , Processed in 0.076866 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部