What is true about the timing of commissioning as it relates to a building flush-out?
A: Commissioning can occur during the flush-out if it does not introduce any additional contaminants into the building
B: Commissioning must be completed before the building flush-out
C: Commissioning can only occur at the same time as a flush-out if an occupied flush-out is being performed
D: Commissioning cannot begin until after the building flush-out has been completed

参考答案: A

本题解释:
Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy, Implementation Commissioning can occur during the flush-out if it does not introduce any additional contaminant into the building.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-22 19:18 , Processed in 0.076529 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部