- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED v4 ID+C模拟题A卷英文[查看] A project team believes they can generate less than 2.5 pounds of construction waste per square foot (12.2 kg/m2) by using source reduction strategies such as modular components and prefabricated wall assemblies for the project. What will the project team need to document for MR Credit Construction and Demolition Waste Management Option 2 Reduction of Total Waste Material? A: MR Construction and Demolition Waste Management calculator B: Recycling rates for comingled facilities C: Total waste per area D: A 24-hour waste stream audit of the project\'s top five recyclable waste streams 参考答案: C
本题解释: Note :A :This is required for Option 1 of the credit. B: This is required for Option 1 of the credit. C :Project teams choosing Option 2 need to use source reduction strategies to reduce the quantity of waste generated on site.The required documentation is the total waste per area. D: This is required for retail projects as part of MR Prerequisite Storage and Collection of Recyclables.
|
|