试卷: LEED v4 BD+C中文模拟题(A)[查看] 项目在施工前必须获得施工通用许可(CGP)。关于项目能否获得可持续场地(SS)先决条件:施工活动污染防治,下列哪种说法是正确的?A project is required to obtain a construction general permit (CGP) prior to construction.Which statement is true about the project achieving SS Prerequisite Construction Activity Pollution Prevention? A: 不需要提供额外的水土流失与沉积控制(ESC)计划 No additional erosion and sedimentation control plan is necessary. B: 项目水文学家必须进行场地评估 A project hydrologist must conduct a site evaluation. C: 项目团队必须进行场地评估 The project team must conduct a site assessment. D: 土建工程师应该确定地方法规要求是否达到或超过施工通用许可(CGP)要求 The civil engineer should determine if local code requirements meet or exceed the CGP. 参考答案: A
本题解释: 正确答案:A
解析:A:如果项目遵循施工通用许可(CGP)要求,项目团队采用简化路径来遵循先决条件要求,也可以,不需要再提供额外土流失与沉积控制(ESC)计划。If the project requires a CGP, the project team has a streamlined path for complying with the prerequisite. No additional ESC plan is needed.
B:不需要,项目已经遵循施工通用许可(CGP)要求。This is not necessary because the CGP is required.
C:不正确。This is not correct.
D:不需要,项目已经遵循施工通用许可(CGP)要求。This is not necessary because the CGP is required. |
|