试卷: SITES AP 英文判断题(v2)A[查看] 70. P3.1 Manage Precip on Site (meet BMP database req)
C3.3 Manage precip beyond baseline \"
P3.2 Reduce water use for landscape irrigation (min 3 yrs)
C3.4 Reduce outdoor water use \"
C3.6 Restore aquatic ecosystems (min 4 yrs up to 10 yrs)
P4.2 Control and manage invasive plants (min 3 yrs)
C4.7 Conserve and restore native plant communities (min 3 yrs)
C6.2 Provide optimum site accessibility, safety and wayfinding (6 mos to 1 yr)
C6.4 Support mental restoration (6 mos to 1 yr)
C6.5 Support physical activity (6 mos to 1 yr)
C6.6 Support social connection (6 mos to 1 yr)
P7.3 Restore soils disturbed by construction OR P7.4 Restore soils disturbed by previous development (min 5 yrs)
C9.1 Promote sustainability awareness and education (6 mos to 1 yr) → Section 9: Credit 9.3
Plan to monitor and report site performance
Eligible Prereq/Credits for Monitoring
参考答案: 正确 |
|