LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 260|回复: 0
打印 上一主题 下一主题

A major renovation of a 30,000 sq. ft. dormitory on a college campus will includ

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-12 18:42:55 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题D[查看]
A major renovation of a 30,000 sq. ft. dormitory on a college campus will include removing
fill dirt and contouring the land to prevent water damage to the building foundation. Which
of the following is required to achieve Sustainable Sites Prerequisite, Construction Activity
Pollution Prevention?
A: Confirmation that the project complies with NPDES or local regulations if more stringent
B: Best Management Practices (BMP) plan
C: Landscape architect sign off on all pollution prevention actions
D: Making sure the post-development runoff rate does not exceed the pre-development runoff rate

参考答案: A

本题解释:
Notes:
Reference: Sustainable Sites Prerequisite, Construction Activity Pollution Prevention,
Requirements
The project must comply with the more stringent of NPDES or local regulations.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 22:49 , Processed in 0.079589 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部