A core and shell project in Nevada has a wind energy system added to the roof. According
to the US DOE’s Commercial Buildings Energy Consumption Survey the estimated
electricity the project will use will be 100,000 kWh/year. Energy costs in the area are
$8.15/kWh. How much energy must the wind system produce to earn 4 points for Energy
and Atmosphere Credit, On-Site Renewable Energy?
A: $57,050
B: $8,150
C: 4,000 kWh
D: 1,000 kWh

参考答案: B

本题解释:
Notes:
To earn four points, a Core and Shell project must get 1% of the buildings annual energy
cost from on-site renewable energy.
On-site renewable energy is calculated as a percent of the building’s annual energy cost.
The correct answer is 1% of the cost, not 1% of the total energy.
The estimated energy use is 100,000 kWh from the CBECS database. This multiplied by
the cost per kilowatt hour gives an annual energy cost of $815,000.
$815,000 X 1% (0.01) = $8,150
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 23:25 , Processed in 0.076520 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部