试卷: LEED AP BD+C模拟题A[查看] A contractor is putting together an IAQ management plan to reduce the indoor contaminants of a
new community center. What can the contractor do for the pre-occupancy phase to achieve Indoor
Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before
Occupancy? A: Prohibit smoking inside the building once the building is enclosed B: Demonstrate contaminant concentrations have not been exceeded using air quality testing C: Protecting installed absorptive materials from moisture damage D: Meet or exceed SMACNA IAQ Guidelines 参考答案: B
本题解释: Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management
Plan-Before Occupancy, Requirements
The two options for this credit are a building flush-out or air quality testing.
The choices of \'Protect installed absorptive materials from moisture damage\' and \'Meet or exceed
SMACNA IAQ Guidelines\' are requirements During Construction.
Prohibiting smoking once the building is enclosed is an additional requirement for schools.
Note that \'during construction\' can be confused with \'pre-occupancy\' because there are no
occupants in the building. However these two terms describe different periods of time in the
LEED rating system. |
|