What strategy to control and reduce stormwater runoff will hold water and reduce

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-10 09:04:58 |只看该作者 |倒序浏览
试卷: LEED GA模拟题A[查看]
What strategy to control and reduce stormwater runoff will hold water and reduce the rate of runoff?
A: Install pervious pavement
B: Reduce the size of the building footprint
C: Increase the area of permeable surfaces
D: Direct runoff into dry ponds

参考答案: D

本题解释:
Pervious pavement is designed to allow percolation or infiltration of stormwater through the surface into the soil below where the water is naturally filtered and pollutants are removed. This would reduce the rate but not hold any water;Reducing the building footprint will reduce impervious surfaces. This reduces the rate but does not hold water;Increasing permeable surfaces reduces the rate of runoff but this strategy does not retain the water;A dry pond (detention pond) is used to store excess stormwater. Dry ponds are basins whose outlets have been designed to detain stormwater runoff for some minimum time (e.g., 24 hours). The stormwater will slowly seep into the ground to recharge aquifers or discharge as determined by the pond design to allow pollutants to settle. Unlike wet ponds, these facilities do not have a large permanent pool of water.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 02:33 , Processed in 0.077120 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部