A project team decides to build up instead of out resulting in an increase in th

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-10 09:04:58 |只看该作者 |倒序浏览
试卷: LEED GA模拟题B[查看]
A project team decides to build up instead of out resulting in an increase in the floor area ratio of an office building. What credit might this help earn if the additional land area is turned into a dry pond?
A: Brownfield Redevelopment
B: Water Efficient Landscaping
C: Development Density
D: Stormwater Design

参考答案: D

本题解释:
Development density is the total square footage of buildings in a particular area divided by acre amount of the same area, expressed as SF/Acre. For example 20,000 SF per acre; If the floor area ratio is increasing by building up instead of out that means the building footprint is decreasing. A smaller building footprint will mean there is more open space available (assuming it doesn\'t get paved).

A dry pond (detention pond) is used to store excess stormwater. Dry ponds are basins whose outlets have been designed to detain stormwater runoff for some minimum time (e.g., 24 hours). The stormwater will slowly seep into the ground or discharge as determined by the pond design to allow pollutants to settle. Unlike wet ponds, these facilities do not have a large permanent pool of water.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-24 10:21 , Processed in 0.081289 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部