- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷D[查看] An office project will occupy an entire four story building. Each story is 25,000 SF. The project team will conduct a phased flush out plan for Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy. What is the minimum outdoor air delivery rate post-occupancy? A: 14,000 CFM B: 15,000 CFM C: 7,500 CFM D: 30,000 CFM 参考答案: D
本题解释: Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo
According to Path 2, the occupied space must be ventilated at a rate of 0.3 CFM per square foot.
Since the building is 100,000 SF, the ventilation rate post occupancy must be at least 30,000 CFM.
100,000 SF x 0.30 SF / SF |
|