- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷D[查看] A 4-story office building has a baseline energy use of 1M kWh/year at a cost of $80,000. The project space for a new tenant will use 1 story of the building. Rooftop solar panels provide 100,000 kWh/year of power to the building. What minimum amount of electricity cost for the building would qualify this project for the maximum number of onsite renewable energy points? A: $400 B: $8,000 C: $800 D: $4,000 参考答案: B
本题解释: Notes:
See Sustainable Sites Credit, Site Selection, Option 2, Path 11
Maximum credit is earned when onsite renewable energy supplies 10% or more of a building\'s total energy use. This includes 2 points for the credit and 1 point for exemplary performance. This percentage is based on the total building, not the size of the tenant space. Exemplary performance for this option is 10% onsite renewable energy.
$80,000 yr X 10% = $8,000 |
|