LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 690|回复: 0
打印 上一主题 下一主题

An office project is designed for a building with a 100% green roof. 25% of the

[复制链接]

1759

主题

1

好友

5678

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:31:43 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
An office project is designed for a building with a 100% green roof. 25% of the building’s electricity comes from renewable energy certificates. The project team is seeking permission to decrease the size of the green roof and add 5,000 sq. ft. of photovoltaic cells to the roof. What project areas will this design change effect?
A: Energy and Atmosphere Credit, Green Power
B: Energy and Atmosphere Prerequisite, Minimum Energy Performance
C: Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building Energy Systems
D: Sustainable Sites Credit, Site Selection, Heat Island Reduction-Roof

参考答案: C

本题解释:
Notes:

Renewable energy systems (wind, solar, etc.) are part of the commissioning process for Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building Energy Systems.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-6 23:35 , Processed in 0.072596 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部