试卷: LEED AP ID+C 模拟试卷D[查看] A contractor is putting together an IAQ management plan to reduce the indoor contaminants of a new office. What can the contractor do for the pre-occupancy phase to achieve Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy? A: Demonstrate contaminant concentrations have not been exceeded using air quality testing B: Protecting installed absorptive materials from moisture damage C: Prohibit smoking inside the building once the building is enclosed D: Meet or exceed SMACNA IAQ Guidelines 参考答案: A
本题解释: Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo
The two options for this credit are a building flush-out or air quality testing.
The choices of \'Protect installed absorptive materials from moisture damage\' and \'Meet or exceed SMACNA IAQ Guidelines\' are requirements \'During Construction\' not \'Pre-Occupancy\' as described in the question
Prohibiting smoking once the building is enclosed is an additional requirement for schools.
Note that \'during construction\' can be confused with \'pre-occupancy\' because there are no occupants in the building. However these two terms describe different periods of time in project construction as understood in the LEED rating system. |
|