A project anticipates earning both fundamental and enhanced commissioning. Which additional tasks will the commissioning authority need to perform to achieve enhanced commissioning beyond fundamental commissioning?
A: Estimate projected energy savings
B: Define a post installation inspection plan
C: Review the tenant space operation 8-10 months after final acceptance
D: Describe the method of ensuring accurate energy savings determination

参考答案: C

本题解释:
Notes:

See Energy and Atmosphere Credit, Enhanced Commissioning, Requirements

Note the differences between what requirements must be met for enhanced commissioning vs. those for fundamental commissioning. Each has six different requirements.

The incorrect answers are taken from what is required for a M&V plan.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-6 04:42 , Processed in 0.081627 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部