试卷: LEED AP ID+C 模拟试卷C[查看] An office project will be located in a 1-year old building that was constructed on a Greenfield site. What, if present, will help achieve Sustainable Sites Credit, Site Selection-Stormwater Design-Quantity Control? (choose 2)
A: Stormwater management plan that exceeds the pre-development run-off rate B: Stormwater management plan that exceeds the pre-development run-off rate C: Stormwater management plan that exceeds the pre-development run-off rate D: Pervious paving E: Rainwater recycling 参考答案: DE
本题解释: Pervious paving reduces the quantity of stormwater runoff.
Rainwater recycling helps capture water for other uses.
An albedo rate has nothing to do with stormwater design.
The stormwater management plan rate must be equal or less than the pre-development run-off rate.