试卷: LEED AP ID+C 模拟试卷A[查看] How can the project team calculate the materials costs for MR credits? A: Apply a 45% factor to total costs (excluding labor and equipment) or use actual cost or replacement value for the materials B: Apply a 45% factor to total costs (including labor and equipment) C: Apply a 45% factor to total costs (excluding labor and equipment) D: Use the actual cost or replacement value for the materials 参考答案: D
本题解释: LEED BD+C allows project teams to apply a 45% factor to total costs (including labor and equipment) to establish a default total materials cost for a project. LEED ID+C does not have a default value, so the actual cost or replacement cost must be used. |
|