An asphalt concrete mix is purchased to resurface a parking lot. The sand for th

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-29 22:19:53 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
An asphalt concrete mix is purchased to resurface a parking lot. The sand for the cement is extracted 220 miles away, the concrete is from 750 miles away, and the aggregate is from 625 miles away. The total cost for the concrete will be $265,000. Concrete will make up 15%, sand 35% and aggregate 50%. What is the allowable cost for Materials and Resources Credit, Regional Materials?
A: $92,750
B: $0
C: $265,000
D: $132,500

参考答案: A

本题解释:
Reference: Materials and Resources Credit, Regional Materials

Weigh the percentage of the qualifying material for the allowable cost.

Sand is the only part of the concrete that meets the requirements for regional material, within 500 miles.

The sand is 35% of the total mix. $265,000 X 35% = $92,750

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:53 , Processed in 0.071764 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部