- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷A[查看] A corporate headquarters will have space for 600 occupants when the building is complete. The building will use natural ventilation. What design decision would not help the project earn both Indoor Environmental Quality Credit, Controllability of Systems, Lighting and Thermal Comfort? A: Provide individual task lighting for 540 of the occupants B: Provide comfort system controls for all densely occupied spaces C: Install operable windows and locate at least 300 occupants 20 feet inside and 10 feet to either side of the windows D: Provide lighting controls for all training and conference rooms 参考答案: B
本题解释: Note the question contains the word NOT and is requesting the answers that will not help earn BOTH credits.
Densely occupied spaces are not part of Controllability of Systems.
For Thermal Comfort individual comfort controls are needed for 50% of the building occupants. In this example that would be 300 occupants. Operable windows are acceptable for this credit for occupants close enough to the windows.
Providing lighting controls for 90% of occupants is required for lighting controls for individual task needs.
Lighting controls are needed for all multi-occupant spaces. Training and conference rooms are multi-occupant spaces. |
|