LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 232|回复: 0
打印 上一主题 下一主题

A project design includes a 12,000 gallon stormwater cistern to capture stormwat

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:44:51 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A project design includes a 12,000 gallon stormwater cistern to capture stormwater from
the roof of the building. The stormwater harvested in the cistern can be substituted for
potable water uses in what aspects of the building?(choose 2)
A: Custodial work
B: Dishwashers
C: Fire suppression
D: Laundry washing

参考答案: AC

本题解释:
Notes:
See Sustainable Sites Credit, Stormwater Design-Quantity Control, Implementation, Harvesting
Stormwater Runoff
Stormwater can be substituted for potable water uses in several areas:
-irrigation
-fire suppression
-flush fixtures
-janitorial cleaning
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-28 03:57 , Processed in 0.076558 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部