试卷: LEED AP BD+C模拟题D[查看] The owner of a new oceanfront museum project wants to use 35% green power, but the direct purchase of Green-e certified power is not available through the local utilities. An energy model was not done for Energy and Atmosphere Credit, Optimize Energy Performance. What information is not required when determining the quantity of Tradable Renewable Certificates to purchase? A: Total building area (sq. ft.) B: Median electrical intensity (kWh/sf-yr) C: Building type D: Emissions criteria for the non-renewable portion of the electricity 参考答案: D
本题解释: Notes:
The CBECS database uses the building type and total building area to determine the
default electricity consumption. The median electrical intensity will be used to determine
the required green power quantity. |
|