LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 226|回复: 0
打印 上一主题 下一主题

A project team has not been able to perform an energy simulation for Energy and

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:44:51 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A project team has not been able to perform an energy simulation for Energy and
Atmosphere Credit, Optimize Energy Performance. For Energy and Atmosphere Credit,
On-Site Renewable Energy, where can the project team find information to determine
the energy cost supplied by the renewable energy systems?
A: EPA Energy Guide by Metro Area
B: Commercial Buildings Energy Consumption Survey
C: US DOE 2003 Commercial Sector Average Energy Costs by State
D: Registered Project Tools database

参考答案: B

本题解释:
Notes:
Reference: Energy and Atmosphere Credit, On-Site Renewable Energy, Calculations
Energy calculations can come from the energy calculated by the Energy and Atmosphere
Credit, Optimize Energy Performance or the CBECS database.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-28 04:06 , Processed in 0.078693 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部