LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 210|回复: 0
打印 上一主题 下一主题

Which of the following are not Minimum Program Requirements for a LEED for New <

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:44:51 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
Which of the following are not Minimum Program Requirements for a LEED for New
Construction project?
A: The project must have zero use of CFC-based refrigerants
B: The project must serve 1 or more Full Time Equivalent (FTE) occupant(s)
C: The gross floor area of LEED project must be no less than 2% of the gross land area within the LEED project boundary
D: All project must comply with applicable federal, state, local building-related environmental laws and regulations in place

参考答案: A

本题解释:
Zero use of CFC-based refrigerants is the prerequisite for Fundamental
Refrigerant Management. This is not a MPR - it is a prerequisite.

LEED NC projects must serve at least 1 FTE.

This requirement is for the minimum building area to site area ratio.

This MPR is for complying with environmental laws.

Reference: GBCI Minimum Project Requirements
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 13:19 , Processed in 0.080938 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部