试卷: LEED GA模拟题C[查看] What should be included in a construction waste management plan for the demolition of an existing building? A: The design of the size of the building B: Installation of a composting system for occupants C: The removal of any CFC-based refrigerants D: Where to dispose of any PCBs 参考答案: D
本题解释: Notes:
Reference: LEED 2009 for New Construction and Major Renovations Rating System
The size of the building impacts the quantity of construction waste, but this decision is not part of the construction waste management plan.
Composting would occur post-construction when the building has occupants.
CFC removal would be done by a specialist. This would not be part of the waste management plan.
POLYCHLORINATED BI-PHENYLS (PCB\'s) are a common chemical hazard, in spite of the fact that use has been banned since 1979. They were widely used in older electrical equipment as an insulating fluid.
Hazardous material removal is part of the plan. Hazardous materials do not count toward the percent of debris diverted from landfills but they are still included in the waste management plan. |
|