试卷: LEED GA模拟题B[查看] Building permit fees for a project are what type of cost?
A: Soft cost B: Life cycle cost C: Operating cost D: Hard cost 参考答案: A
本题解释: A soft construction cost is one that is not directly related to building, construction, etc. These include building permit fees, architect fees, legal, financing, engineering fees, commissioning, and other costs incurred before and after construction;Life cycle costing (LCC) is the evaluation of the total cost of a building or product over its useful life, including initial, maintenance, repair and replacement costs as well as savings. LCC evaluates economic performance; Operating costs are another type of cost for a building in addition to hard and soft costs. These costs occur after the building is complete and up and running. These costs include utilities such as water and electricity as well as the costs of maintenance personnel - janitorial, landscape, security; Hard costs: By far the largest portion of the expenses in a construction budget, the hard costs are mostly comprised of the actual construction costs incurred to build the project.
Examples include masonry, wood, steel, carpet, tile, mechanical systems, roofing. |
|