LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 333|回复: 0
打印 上一主题 下一主题

in the construction process of a project, it was found that the construction cos

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2020-8-27 19:27:18 |只看该作者 |倒序浏览
试卷: LEED v4 BD+C英文模拟题(C)[查看]
in the construction process of a project, it was found that the construction cost exceeded the budget, so the owner decided to reduce the parking space in the site. As a LEED AP, it was suggested that the owner should reduce the parking space in the site?
A: Discuss sharing parking spaces with neighboring properties
B: Reduce underground parking
C: Increase street parking
D: Reduce bicycle parking

参考答案: A
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 11:53 , Processed in 0.079138 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部