LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
new medical and office buildings, which points are different? admin 2020-8-27 01548 admin 2020-8-27 19:27
A project is located in humid temperate zone, and the building is covered by sur admin 2020-8-27 0620 admin 2020-8-27 19:27
In order to get more scores in energy and atmosphere, what is the correct statem admin 2020-8-27 0810 admin 2020-8-27 19:27
in winter heating of a project, 40 ℃ warm air is delivered from the ceiling to admin 2020-8-27 0602 admin 2020-8-27 19:27
Where will LEED get a score of 36 in community site selection?
Where will th
admin 2020-8-27 0629 admin 2020-8-27 19:27
A school project is calculating the surrounding density of the project. Which of admin 2020-8-27 0590 admin 2020-8-27 19:27
which of the following measures may increase the outdoor water consumption of th admin 2020-8-27 0600 admin 2020-8-27 19:27
When calculating the items of MR, reducing the impact of building life cycle, an admin 2020-8-27 0602 admin 2020-8-27 19:27
Which is not clean energy admin 2020-8-27 01395 admin 2020-8-27 19:27
What can be done to debug the project? admin 2020-8-27 01386 admin 2020-8-27 19:27
a project is located in a remote area, vulnerable to storms in winter and closed admin 2020-8-27 0584 admin 2020-8-27 19:27
in the calculation of indoor water consumption reduction building water consumpt admin 2020-8-27 0601 admin 2020-8-27 19:27
Which of the following can meet the requirements of thermal comfort and energy s admin 2020-8-27 0638 admin 2020-8-27 19:27
Which of the following methods should be adopted to evaluate the environmental i admin 2020-8-27 0595 admin 2020-8-27 19:27
When calculating the items of MR, reducing the impact of building life cycle, an admin 2020-8-27 01262 admin 2020-8-27 19:27
in order to meet the requirements of LT score item green vehicle, the project ca admin 2020-8-27 0662 admin 2020-8-27 19:27
which LEED score may be affected by the owner of a project who insists on using admin 2020-8-27 0669 admin 2020-8-27 19:27
A BM system is installed in a project, and the project energy consumption can be admin 2020-8-27 0582 admin 2020-8-27 19:27
As for the three-year Sri value of materials, the correct statement is? admin 2020-8-27 0638 admin 2020-8-27 19:27
The annual electricity consumption of a project is 22500kwh, and the project doe admin 2020-8-27 0643 admin 2020-8-27 19:27

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-11 10:49 , Processed in 0.044004 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部