LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
What can be done to debug the project? admin 2020-8-27 0420 admin 2020-8-27 19:27
a project is located in a remote area, vulnerable to storms in winter and closed admin 2020-8-27 0161 admin 2020-8-27 19:27
in the calculation of indoor water consumption reduction building water consumpt admin 2020-8-27 0159 admin 2020-8-27 19:27
Which of the following can meet the requirements of thermal comfort and energy s admin 2020-8-27 0155 admin 2020-8-27 19:27
Which of the following methods should be adopted to evaluate the environmental i admin 2020-8-27 0152 admin 2020-8-27 19:27
When calculating the items of MR, reducing the impact of building life cycle, an admin 2020-8-27 0423 admin 2020-8-27 19:27
in order to meet the requirements of LT score item green vehicle, the project ca admin 2020-8-27 0159 admin 2020-8-27 19:27
which LEED score may be affected by the owner of a project who insists on using admin 2020-8-27 0160 admin 2020-8-27 19:27
A BM system is installed in a project, and the project energy consumption can be admin 2020-8-27 0142 admin 2020-8-27 19:27
As for the three-year Sri value of materials, the correct statement is? admin 2020-8-27 0158 admin 2020-8-27 19:27
The annual electricity consumption of a project is 22500kwh, and the project doe admin 2020-8-27 0173 admin 2020-8-27 19:27
according to the analysis, publicity and optimization of construction products - admin 2020-8-27 0144 admin 2020-8-27 19:27
for the initial energy consumption simulation of the project, which stage is rec admin 2020-8-27 0154 admin 2020-8-27 19:27
LEED certification encourages the project to hold a workshop at the beginning of admin 2020-8-27 0186 admin 2020-8-27 14:04
a school, it is suggested to open a window in the classroom, how to report to t admin 2020-8-27 0350 admin 2020-8-27 09:37
How to install water meters to measure water consumption when multiple buildings admin 2020-8-27 0169 admin 2020-8-27 09:37
For energy consumption simulation, which parameters of the benchmark building an admin 2020-8-27 0134 admin 2020-8-27 09:37
a project statistical score found that only one point from platinum.There is a admin 2020-8-27 0403 admin 2020-8-27 09:36
hich of the following situations can apply for innovation score? admin 2020-8-27 0155 admin 2020-8-27 09:36
when calculating light pollution, which of the following should be included in t admin 2020-8-27 0124 admin 2020-8-27 09:36

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 22:49 , Processed in 0.070748 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部