LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which salvaged materials contribute to achieving Materials Reuse? PrincessWas 2012-7-29 0610 PrincessWas 2012-7-29 12:12
What renewable energy systems are not eligible for Sustainable Sites Credit, Sit admin 2012-7-29 01137 admin 2012-7-29 12:12
A campus lecture hall is being renovated in a hot southern region. What measures PrincessWas 2012-7-29 0479 PrincessWas 2012-7-29 12:12
A university is renovating a 60,000 sq. ft. student center. Who could serve as t PrincessWas 2012-7-29 0537 PrincessWas 2012-7-29 12:12
Best management practices used to treat runoff must be capable of removing: PrincessWas 2012-7-29 0509 PrincessWas 2012-7-29 12:12
A project uses steel for office wall frames. No information is available on the PrincessWas 2012-7-29 01073 PrincessWas 2012-7-29 12:12
A project team is discussing increasing the ventilation of a planned building in admin 2012-7-29 01221 admin 2012-7-29 12:12
A site has 100,000 sq. ft. in hardscapes, and 25,000 sq. ft. of the hardscapes h admin 2012-7-29 01109 admin 2012-7-29 12:12
A project team on a renovation project is determining what construction debris m admin 2012-7-29 0628 admin 2012-7-29 12:12
A building owner has contracted for Green-e power. The building will house two t PrincessWas 2012-7-29 0935 PrincessWas 2012-7-29 12:12
A company is using certified wood products to fabricate high-end workstations. T admin 2012-7-29 0447 admin 2012-7-29 12:12
An established business owner is moving into a larger tenant space. The owner al PrincessWas 2012-7-29 01142 PrincessWas 2012-7-29 12:12
Once occupied a tenant space will have 400 occupants. The tenant will occupy 80, PrincessWas 2012-7-29 0960 PrincessWas 2012-7-29 12:12
A multi-unit residential building is naturally ventilated. The residents are per admin 2012-7-29 01322 admin 2012-7-29 12:12
A building contractor will use IAQ testing to verify maximum contaminant concent admin 2012-7-29 01206 admin 2012-7-29 12:12
A building has natural ventilation. How can the project team demonstrate credit PrincessWas 2012-7-29 0574 PrincessWas 2012-7-29 12:12
A project team has installed individual thermal comfort controls for occupants. admin 2012-7-29 0596 admin 2012-7-29 12:12
An office project will occupy 25,000 sq. ft. of a 100,000 sq. ft. building. What PrincessWas 2012-7-29 0536 PrincessWas 2012-7-29 12:12
In the design phase the architect calculated the materials cost for a project as PrincessWas 2012-7-29 01542 PrincessWas 2012-7-29 11:39
An office space has a baseline water use of 400,000 gallons. What must the desig admin 2012-7-29 0570 admin 2012-7-29 11:18

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-10-14 12:22 , Processed in 0.085383 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部