LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A building contractor is finalizing the tasks that must be complete before a bui PrincessWas 2012-7-29 0589 PrincessWas 2012-7-29 14:39
A contractor will install $250,000 of rapidly renewable resources. The project b admin 2012-7-29 0244 admin 2012-7-29 14:39
A tenant wants to minimize energy use on a project. Which strategy would most li PrincessWas 2012-7-29 0206 PrincessWas 2012-7-29 14:39
A doctor\\\'s office will monitor outdoor air and increase the ventilation of th admin 2012-7-29 0459 admin 2012-7-29 14:39
A project is planning on 900 cubical spaces, 25 conference room, and 30 executiv PrincessWas 2012-7-29 0219 PrincessWas 2012-7-29 14:39
An office space has 50,000 sq. ft. of floor area. 30,000 sq. ft. of the floor ar admin 2012-7-29 0316 admin 2012-7-29 14:39
An office project is located in a northern climate with significant rainfall. Wh admin 2012-7-29 0230 admin 2012-7-29 14:39
The sum square footage of all daylit or daylighted spaces is 35,468 sq. ft. The admin 2012-7-29 0509 admin 2012-7-29 14:39
A construction project purchases the following wood products. What percentage ca admin 2012-7-29 0337 admin 2012-7-29 14:39
SMACNA guidelines must be followed to achieve what credit? admin 2012-7-29 0447 admin 2012-7-29 14:39
An office project will have space for a combined 100 workstations and private of admin 2012-7-29 0393 admin 2012-7-29 14:38
In the design phase a project team has selected energy-efficient equipment and a admin 2012-7-29 0577 admin 2012-7-29 14:38
A landscape designer has been brought in to an office building to make suggestio PrincessWas 2012-7-29 0244 PrincessWas 2012-7-29 14:38
Which projects are eligible for Materials and Resources Credit, Tenant Space-Lon admin 2012-7-29 0503 admin 2012-7-29 14:38
A project is located in a building developed on a site with a zero-lot-line. If admin 2012-7-29 0263 admin 2012-7-29 14:38
Which materials can be utilized for Materials and Resources Credit Rapidly Renew PrincessWas 2012-7-29 0235 PrincessWas 2012-7-29 14:38
A building owner is reviewing potential building sites that may provide the proj admin 2012-7-29 0532 admin 2012-7-29 14:38
A project team is discussing synergies in the LEED charrette. Air filtration med admin 2012-7-29 0351 admin 2012-7-29 14:38
Replacing filtration media at the completion of construction should be coordinat admin 2012-7-29 0443 admin 2012-7-29 14:38
A project team is attempting Indoor Environmental Quality Credit, Construction I admin 2012-7-29 0305 admin 2012-7-29 14:38

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-22 22:52 , Processed in 0.091731 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部