LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
An emergency veterinary office located in a strip mall will be open 24 hours a d PrincessWas 2012-8-3 01392 PrincessWas 2012-8-3 09:23
How can the project team calculate the materials costs for MR credits? admin 2012-8-3 01567 admin 2012-8-3 09:23
Which products are NOT included in Composite Wood and Agrifiber Products? admin 2012-8-3 01147 admin 2012-8-3 09:23
In a mechanically ventilated office project many of the office workers will have PrincessWas 2012-8-3 01597 PrincessWas 2012-8-3 09:23
An office space on the bottom floor of a building has no skylights. A project wi admin 2012-8-3 01517 admin 2012-8-3 09:23
A tenant space is chosen that has an underground stormwater treatment system tha PrincessWas 2012-8-3 01665 PrincessWas 2012-8-3 09:23
What project strategy would earn the most points for optimizing energy performan admin 2012-8-3 0757 admin 2012-8-3 09:23
A contractor will conduct a phased flush out of a building. The office building PrincessWas 2012-8-3 0742 PrincessWas 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0710 admin 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 01646 admin 2012-8-3 09:23
A project will reuse refurbished steel door hardware obtained off-site from a sa admin 2012-8-3 0720 admin 2012-8-3 09:23
A contractor is documenting an IAQ plan that will be provided to each sub-contra PrincessWas 2012-8-3 01632 PrincessWas 2012-8-3 09:23
A project building is 68,490 sf. A tenant has leased out 50,200 sf. The project PrincessWas 2012-8-3 01594 PrincessWas 2012-8-3 09:23
A tenant has chosen office space in a LEED-certified New Construction building t admin 2012-8-3 01573 admin 2012-8-3 09:23
An office park in a suburban area needs to earn Sustainable Sites Credit, Heat I admin 2012-8-3 01747 admin 2012-8-3 09:23
What certification program tests and certifies hard surface flooring and associa PrincessWas 2012-8-3 0888 PrincessWas 2012-8-3 09:23
A project site has been chosen where the prior project team of the building had PrincessWas 2012-8-3 0774 PrincessWas 2012-8-3 09:23
For a project that uses an overhead variable air volume system, enough control p PrincessWas 2012-8-3 0678 PrincessWas 2012-8-3 09:23
When using the VOC budget methodology, by what amount must the design case be le PrincessWas 2012-8-3 0773 PrincessWas 2012-8-3 09:23
A building is being renovated and the owner will occupy the fourth floor of a 4- PrincessWas 2012-8-3 0886 PrincessWas 2012-8-3 09:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-26 12:44 , Processed in 0.058203 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部