LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
An old office building is being renovated. What should be the design strategy to PrincessWas 2012-7-29 0607 PrincessWas 2012-7-29 22:19
A project design includes an active wastewater treatment system to treat 75% of PrincessWas 2012-7-29 0671 PrincessWas 2012-7-29 22:19
What is an important difference between the energy cost budget and the performan admin 2012-7-29 0639 admin 2012-7-29 22:19
A desktop computer has a rated power of 120 watts. The computer will be upgraded admin 2012-7-29 0563 admin 2012-7-29 22:19
An office building has a total of 646 tenant occupants at peak periods. A new te PrincessWas 2012-7-29 0281 PrincessWas 2012-7-29 22:19
A project is located 1/2 mile from a commuter light rail stop and wants to earn PrincessWas 2012-7-29 0547 PrincessWas 2012-7-29 22:19
A tenant has selected a LEED building for some new office space. The building wa PrincessWas 2012-7-29 0217 PrincessWas 2012-7-29 22:19
The total CSI MasterFormat Division 12 Material Value on a project is $1,000,000 PrincessWas 2012-7-29 0529 PrincessWas 2012-7-29 22:19
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2012-7-29 0247 admin 2012-7-29 15:31
A 254,000 sq. ft. building is attempting to earn an exemplary performance point. admin 2012-7-29 0607 admin 2012-7-29 15:31
The space-by-space method would be used to measure what aspect of a project? admin 2012-7-29 0511 admin 2012-7-29 15:31
A 24-hour fitness center is being built out on the second floor of a downtown bu admin 2012-7-29 0539 admin 2012-7-29 15:05
A project will attempt to achieve enhanced commissioning for the project. Which admin 2012-7-29 0549 admin 2012-7-29 15:05
An office project will have high-efficiency toilets that are pressure assisted ( admin 2012-7-29 0424 admin 2012-7-29 15:05
A tenant is allotted 500 parking spaces by the building owner. There are 1000 av admin 2012-7-29 0452 admin 2012-7-29 15:05
A project area is 20,000 sf. The total segment area for the project is 100,000 s admin 2012-7-29 0347 admin 2012-7-29 15:01
A project has daylighting in 81% of required spaces. How many points can this pr admin 2012-7-29 0358 admin 2012-7-29 15:01
A project will renovate and occupy all 5 stories of an office building. Local co admin 2012-7-29 0249 admin 2012-7-29 14:46
What type of energy system cannot earn Sustainable Sites Credit, Site Selection, admin 2012-7-29 0244 admin 2012-7-29 14:39
What is not required for janitorial rooms where chemicals are stored for Indoor admin 2012-7-29 0257 admin 2012-7-29 14:39

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-22 23:27 , Processed in 0.086653 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部