LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
In a new office building design, no carpets and fabrics will be used for the int PrincessWas 2012-7-30 0511 PrincessWas 2012-7-30 10:16
An office manager and project owner are documenting the office equipment used in PrincessWas 2012-7-30 0413 PrincessWas 2012-7-30 10:16
A project owner has selected a non-LEED building for new office space. The build admin 2012-7-30 0325 admin 2012-7-30 10:16
The interior doors for a project will come from a salvaged building. How should admin 2012-7-30 0308 admin 2012-7-30 10:16
Using the building area method an office lighting power allowance came out to 25 PrincessWas 2012-7-30 0491 PrincessWas 2012-7-30 10:16
What are some examples of EFFICIENT LIGHTING technologies? admin 2012-7-30 0658 admin 2012-7-30 09:31
A renovation project will have 50 tons of demolition debris. Of the construction admin 2012-7-29 0546 admin 2012-7-29 22:19
The ASHRAE Standard 55-2004 applies to which of the following? PrincessWas 2012-7-29 0504 PrincessWas 2012-7-29 22:19
A project will use 3 of 10 stories in an office building. Installing occupancy s PrincessWas 2012-7-29 0270 PrincessWas 2012-7-29 22:19
A design team is detailing where wiring will need to be installed in order to pr PrincessWas 2012-7-29 0526 PrincessWas 2012-7-29 22:19
A project team is reviewing strategies for retaining stormwater on site for a pr PrincessWas 2012-7-29 0620 PrincessWas 2012-7-29 22:19
A renovation project will have 50 tons of demolition debris. Of the construction admin 2012-7-29 0256 admin 2012-7-29 22:19
Which types of water fixtures would not contribute to helping a project earning PrincessWas 2012-7-29 0506 PrincessWas 2012-7-29 22:19
How close does a building\\\'s entrance need to be to a rail station or bus stop PrincessWas 2012-7-29 0488 PrincessWas 2012-7-29 22:19
A project area is 20,000 sf. The total segment area for the project is 100,000 s PrincessWas 2012-7-29 0224 PrincessWas 2012-7-29 22:19
The total area of a building is 86,432 sf. A new tenant space will be 26,420 sf. PrincessWas 2012-7-29 0645 PrincessWas 2012-7-29 22:19
A building\\\'s design case for sewage conveyance requires 1,650 gallons of wate admin 2012-7-29 0470 admin 2012-7-29 22:19
An office space is being designed for a company with 100 occupants. The project PrincessWas 2012-7-29 0570 PrincessWas 2012-7-29 22:19
An asphalt concrete mix is purchased to resurface a parking lot. The sand for th PrincessWas 2012-7-29 0566 PrincessWas 2012-7-29 22:19
Which project criteria would not be eligible for Materials and Resources Credit, PrincessWas 2012-7-29 0529 PrincessWas 2012-7-29 22:19

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-22 23:07 , Processed in 0.085621 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部