LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
In a mechanically ventilated office project many of the office workers will have PrincessWas 2012-8-3 0549 PrincessWas 2012-8-3 09:23
An office space on the bottom floor of a building has no skylights. A project wi admin 2012-8-3 0370 admin 2012-8-3 09:23
A tenant space is chosen that has an underground stormwater treatment system tha PrincessWas 2012-8-3 0586 PrincessWas 2012-8-3 09:23
What project strategy would earn the most points for optimizing energy performan admin 2012-8-3 0234 admin 2012-8-3 09:23
A contractor will conduct a phased flush out of a building. The office building PrincessWas 2012-8-3 0220 PrincessWas 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0197 admin 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0491 admin 2012-8-3 09:23
A project will reuse refurbished steel door hardware obtained off-site from a sa admin 2012-8-3 0242 admin 2012-8-3 09:23
A contractor is documenting an IAQ plan that will be provided to each sub-contra PrincessWas 2012-8-3 0578 PrincessWas 2012-8-3 09:23
A project building is 68,490 sf. A tenant has leased out 50,200 sf. The project PrincessWas 2012-8-3 0565 PrincessWas 2012-8-3 09:23
A tenant has chosen office space in a LEED-certified New Construction building t admin 2012-8-3 0443 admin 2012-8-3 09:23
An office park in a suburban area needs to earn Sustainable Sites Credit, Heat I admin 2012-8-3 0625 admin 2012-8-3 09:23
What certification program tests and certifies hard surface flooring and associa PrincessWas 2012-8-3 0421 PrincessWas 2012-8-3 09:23
A project site has been chosen where the prior project team of the building had PrincessWas 2012-8-3 0272 PrincessWas 2012-8-3 09:23
For a project that uses an overhead variable air volume system, enough control p PrincessWas 2012-8-3 0195 PrincessWas 2012-8-3 09:23
When using the VOC budget methodology, by what amount must the design case be le PrincessWas 2012-8-3 0256 PrincessWas 2012-8-3 09:23
A building is being renovated and the owner will occupy the fourth floor of a 4- PrincessWas 2012-8-3 0412 PrincessWas 2012-8-3 09:23
The design team is documenting the basis of design for fundamental commissioning admin 2012-8-3 0524 admin 2012-8-3 09:23
Which factor is used to determine the percentage of materials reused on a projec admin 2012-8-3 0330 admin 2012-8-3 09:23
A project team is attempting to divert construction waste from the landfill. Tot PrincessWas 2012-8-3 0292 PrincessWas 2012-8-3 09:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 04:07 , Processed in 0.084288 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部