LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
What is the default GENDER RATIO for LEED water calculations? admin 2012-8-4 01210 admin 2012-8-4 20:07
A project site is chosen in a rural area. In the charrette the project team is d admin 2012-8-4 02359 admin 2012-8-4 18:36
Which calculations require a baseline case and a design case?(choose 2) admin 2012-8-4 01708 admin 2012-8-4 18:36
What aspects of a building do not affect IAQ? PrincessWas 2012-8-4 01587 PrincessWas 2012-8-4 18:36
A tenant space requires 26 parking spaces as defined by local code. What must th admin 2012-8-4 0721 admin 2012-8-4 18:36
A LEED AP is verifying that project spaces have views to the exterior. At what h PrincessWas 2012-8-4 0760 PrincessWas 2012-8-4 18:36
SS Credit 4.3 Alternative Transportation under LEED for New Construction gives o PrincessWas 2012-8-4 01614 PrincessWas 2012-8-4 18:36
A project will use 78,000 sf of an 112,000 sf building and have 750 FTEs. Local admin 2012-8-4 01216 admin 2012-8-4 18:36
What is not a responsibility of the CxA during fundamental commissioning? PrincessWas 2012-8-4 0775 PrincessWas 2012-8-4 18:36
An office building is located in an arid region. Installing occupancy sensors wo admin 2012-8-4 0881 admin 2012-8-4 18:36
The commissioning authority has the majority of responsibilities in enhanced com PrincessWas 2012-8-4 01047 PrincessWas 2012-8-4 18:36
A project team wants to include steel mechanical components in its calculations PrincessWas 2012-8-4 0739 PrincessWas 2012-8-4 18:36
The total area for a dentist\\\'s office is 18,522 SF. The gross lighting floor PrincessWas 2012-8-4 01613 PrincessWas 2012-8-4 18:36
A project site is 75% developed. The project team wants to improve the stormwate admin 2012-8-4 0734 admin 2012-8-4 18:36
An open office plan will have space for 50 individual workstations around the pe admin 2012-8-4 01663 admin 2012-8-4 18:36
A flooring product consists of a top layer of salvaged pine hardwoods glued to a admin 2012-8-4 01748 admin 2012-8-4 18:36
An office project will occupy an entire four story building. Each story is 25,00 admin 2012-8-4 0745 admin 2012-8-4 18:36
At the beginning of the integrated design process the project team has come toge admin 2012-8-4 01591 admin 2012-8-4 18:36
A project with a 30,000 sq. ft. building footprint has been designed with a 100% PrincessWas 2012-8-4 01640 PrincessWas 2012-8-4 18:36
Which product does not qualify towards rapidly renewable materials? PrincessWas 2012-8-4 0897 PrincessWas 2012-8-4 18:36

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 14:09 , Processed in 0.045342 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部