LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which design decisions can earn a project exemplary performance credit? admin 2012-8-4 0141 admin 2012-8-4 18:35
An office space is being designed for a cooler climate using natural ventilation admin 2012-8-4 0308 admin 2012-8-4 18:35
For a multi-unit residential building that permits smoking, what should be done admin 2012-8-4 0394 admin 2012-8-4 18:35
Which furniture would not need to be tested for Indoor Environmental Quality Cre PrincessWas 2012-8-4 0171 PrincessWas 2012-8-4 18:33
An office building has a 20,000 SF roof with a slope less than or equal to 2:12. PrincessWas 2012-8-4 0411 PrincessWas 2012-8-4 18:33
A project team has not done a Design Energy Cost calculation. For Green Power, w admin 2012-8-4 0449 admin 2012-8-4 18:33
A project design includes a 12,000 gallon stormwater cistern to capture stormwat admin 2012-8-4 0150 admin 2012-8-4 18:33
A project team is calculating the annual water consumption of an office building admin 2012-8-4 0338 admin 2012-8-4 18:33
A project team for a retail project wants to increase the daylighting of the sto admin 2012-8-4 0498 admin 2012-8-4 18:33
A project owner is reviewing potential sites for office space. The project team PrincessWas 2012-8-4 0418 PrincessWas 2012-8-4 18:33
A project has a total building material cost of $10 million. Rapidly renewable m admin 2012-8-4 0261 admin 2012-8-4 18:33
A tenant will build office space in a LEED certified Core and Shell building. Th admin 2012-8-4 0176 admin 2012-8-4 18:33
At the request of the tenant, a project will be modified to include operable win PrincessWas 2012-8-4 0373 PrincessWas 2012-8-4 18:33
A construction project team will have a budget of $657,987 for project material. admin 2012-8-4 0165 admin 2012-8-4 18:33
An office project will have an open floorplan. There will be 1,000 SF of space w admin 2012-8-4 0481 admin 2012-8-4 18:33
The materials cost of a building renovation is $10 million. What cost of reused admin 2012-8-4 0477 admin 2012-8-4 18:33
A project for a new office space has achieved a 30% reduction in water use. 30% PrincessWas 2012-8-4 0159 PrincessWas 2012-8-4 18:33
A lighting designer is determining the needs of a new private after-school tutor PrincessWas 2012-8-4 0348 PrincessWas 2012-8-4 18:33
A project team is designing an office to have a high level of lighting system co PrincessWas 2012-8-4 0343 PrincessWas 2012-8-4 18:33
A project team is reviewing the furniture selections for a project before orderi PrincessWas 2012-8-4 0147 PrincessWas 2012-8-4 18:33

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:07 , Processed in 0.078992 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部