LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Schools must establish an Energy Performance Rating Goal using what? admin 2012-8-4 0207 admin 2012-8-4 20:07
What is the definition of BUILDING FOOTPRINT? admin 2012-8-4 0700 admin 2012-8-4 20:07
At what height must Air Samples be collected for Construction Indoor Air Quality admin 2012-8-4 0224 admin 2012-8-4 20:07
What are LOW-EMITTING vehicles? admin 2012-8-4 0619 admin 2012-8-4 20:07
What must be INCLUDED in water efficiency calculations? admin 2012-8-4 0700 admin 2012-8-4 20:07
A computer actually draws what RANGE, described in percent, of power? admin 2012-8-4 0544 admin 2012-8-4 20:07
What BIOFUEL systems are NOT eligible for On-Site Renewable Energy? admin 2012-8-4 0607 admin 2012-8-4 20:07
What is the minimum number of YEARS a tenant must commit to remain in the same l admin 2012-8-4 0624 admin 2012-8-4 20:07
What does ASHRAE stand for? admin 2012-8-4 0657 admin 2012-8-4 20:07
What types of SALVAGED material should project teams consider for Materials Reus admin 2012-8-4 0208 admin 2012-8-4 20:07
What fixtures, fittings, and appliances are outside the SCOPE OF WORK for Water admin 2012-8-4 0577 admin 2012-8-4 20:07
What PERCENT must an Open-Grid Pavement System be to qualify for SS Path 4. Heat admin 2012-8-4 0202 admin 2012-8-4 20:07
Of CFC\\\'s, HCFC\\\'s, and HFC\\\'s, which are LESS harmful to the environment? admin 2012-8-4 0181 admin 2012-8-4 20:07
What recommendations must the design criteria meet in Naturally Ventilated Space admin 2012-8-4 0658 admin 2012-8-4 20:07
If OCCUPANCY SENSORS are installed for 75% or more of the connected lighting loa admin 2012-8-4 0264 admin 2012-8-4 20:07
When must anticipated services be operational if a project chooses to demonstrat admin 2012-8-4 0627 admin 2012-8-4 20:07
What does MERV stand for? admin 2012-8-4 0646 admin 2012-8-4 20:07
How LONG is furniture tested in the ETV large chamber test? admin 2012-8-4 0644 admin 2012-8-4 20:07
An ALTERNATIVE path to earn HVAC efficiency points is to demonstrate that the sy admin 2012-8-4 0542 admin 2012-8-4 20:07
What types of material should project teams consider for Rapidly Renewable Mater admin 2012-8-4 0244 admin 2012-8-4 20:07

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-9 00:08 , Processed in 0.086856 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部