LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
A 物业管理公司正在考虑提交其 9 个城市办公物业组合以进行 WELL 认证。物业团队正在审 admin 2022-12-8 01560 admin 2022-12-8 16:28
An office building is located where the annual average ambient PM 2.5 level is 3 admin 2022-12-8 0885 admin 2022-12-8 16:28
In order to fulfill the requirement of Feature X10: Pest Management and Pesticid admin 2022-12-8 01323 admin 2022-12-8 16:28
In Part 1: Provide Minimum Background Noise of Feature S06: Minimum Background S admin 2022-12-8 0931 admin 2022-12-8 16:28
The intent of Feature T04: Individual Thermal Control is to maximize and persona admin 2022-12-8 0721 admin 2022-12-8 16:28
Feature L08: Electric Light Quality,This WELL feature requires projects to take admin 2022-12-8 01735 admin 2022-12-8 16:28
It is best to consult an audio engineering professional when...当...时最好咨询音 admin 2022-12-8 01610 admin 2022-12-8 16:28
Which of the following is NOT a part of Feature A04: Construction Pollution Mana admin 2022-12-8 0794 admin 2022-12-8 16:28
According to Part 1: Design for Sound Isolation at Walls and Doors of Feature S0 admin 2022-12-8 01842 admin 2022-12-8 16:28
What is the basic intent of Feature L04: Electric Light Glare Control?Feature L0 admin 2022-12-8 0733 admin 2022-12-8 16:28
In order to meet the requirements of Feature N11: Responsible Food Production, w admin 2022-12-8 02300 admin 2022-12-8 16:28
A building occupant purchases a prepared lunch and pre-packed snack from the caf admin 2022-12-8 0676 admin 2022-12-8 16:28
A building occupant purchases a prepared lunch and pre-packed snack from the caf admin 2022-12-8 0741 admin 2022-12-8 16:28
With the exception of high-humidity areas, the mechanical system has the capabil admin 2022-12-8 0691 admin 2022-12-8 16:28
Which of the following does a property management team need to do when conductin admin 2022-12-8 0669 admin 2022-12-8 16:28
According to Feature C02: Integrative Design Process, who must meet with stakeho admin 2022-12-8 0689 admin 2022-12-8 16:28
A project may provide access to off-site fitness facilities in Part 1: Provide I admin 2022-12-8 0867 admin 2022-12-8 16:28
A new corporate headquarters building is being constructed in a dense urban area admin 2022-12-8 0629 admin 2022-12-8 16:28
In Tokyo, a new mixed-use complex is being planned to replace a retired railyard admin 2022-12-8 0638 admin 2022-12-8 16:28
Beth is a new employee at a company in a WELL building. Which of the following i admin 2022-12-8 0717 admin 2022-12-8 16:28

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-18 12:18 , Processed in 0.040382 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部