LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
When calculating materials costs for some of the MR credit calculations, what is admin 2012-8-12 01342 admin 2012-8-12 16:22
A project design will include two 10,000 gallon storage tanks to capture rainwat admin 2012-8-12 0678 admin 2012-8-12 16:22
A project team is reviewing strategies for retaining stormwater on site for a pr admin 2012-8-12 0690 admin 2012-8-12 16:22
During an early design review, a project team has decided to consolidate the bui admin 2012-8-12 0691 admin 2012-8-12 16:22
When performing a whole building simulation for Energy and Atmosphere Credit, Op admin 2012-8-12 0746 admin 2012-8-12 16:22
The site of a new school has been selected. The school will be built in an empty admin 2012-8-12 0843 admin 2012-8-12 16:22
A schools project in a suburban location is building on a previously developed s admin 2012-8-12 0835 admin 2012-8-12 16:22
A new school project is being modeled for energy use. The baseline building proj admin 2012-8-12 0910 admin 2012-8-12 16:22
An office project earned five points for Energy and Atmosphere Credit, On-Site R admin 2012-8-12 0917 admin 2012-8-12 16:22
In a mechanically ventilated office project many of the office workers will have admin 2012-8-12 0897 admin 2012-8-12 16:22
A contractor is putting together an IAQ management plan to reduce the indoor con admin 2012-8-12 0793 admin 2012-8-12 16:22
A previously developed site has been selected for a new bank. Part of the site w admin 2012-8-12 0867 admin 2012-8-12 16:22
A whole building energy simulation resulted in a baseline building performance o admin 2012-8-12 0751 admin 2012-8-12 16:22
Some of the design strategies a project team is proposing include daylighting, d admin 2012-8-12 01009 admin 2012-8-12 16:22
A school project is expected to have 745 students in grades K-8 and is located 1 admin 2012-8-12 0920 admin 2012-8-12 16:22
A renovation project includes refurbished bamboo flooring that will satisfy the admin 2012-8-12 0866 admin 2012-8-12 16:22
A new high-rise residential project is going up in a master site development. Th admin 2012-8-12 0678 admin 2012-8-12 16:22
Which product does not qualify towards rapidly renewable materials? admin 2012-8-12 0899 admin 2012-8-12 16:22
A subcontractor paints a row of offices in a new construction project with high- admin 2012-8-12 0696 admin 2012-8-12 16:22
A project has a 980 sq. ft. shared workspace. The plan area of direct line of si admin 2012-8-12 0901 admin 2012-8-12 16:22

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 13:00 , Processed in 0.049067 second(s), 20 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部