A lighting designer is running a computer simulation model to verify that the da PrincessWas 2012-8-10 0221 PrincessWas 2012-8-10 20:19
A project is purchasing salvaged bricks from a local company that sourced the br PrincessWas 2012-8-10 0612 PrincessWas 2012-8-10 20:19
One story of a five-story office building is being renovated for new office spac admin 2012-8-10 0647 admin 2012-8-10 20:19
When should a project team choose the performance rating method for Energy and A admin 2012-8-10 0558 admin 2012-8-10 20:19
An office building project with a retail component on the first floor totals 1,0 PrincessWas 2012-8-10 0625 PrincessWas 2012-8-10 20:19
The tenant of a building would like to purchase green power for their LEED proje admin 2012-8-10 0445 admin 2012-8-10 20:19
wfewfeffefefefe gegegege gegeg admin 2012-8-10 0250 admin 2012-8-10 19:56
The roof of an office building is approximately 30,000 sq. ft. Skylights and mec admin 2012-8-10 0324 admin 2012-8-10 19:51
In a condominium project, what requirements must be met for ETS control if the h admin 2012-8-10 0387 admin 2012-8-10 16:15
A new 24-hour veterinary clinic is being built in a neighborhood business distri admin 2012-8-10 0457 admin 2012-8-10 16:15
What is true about the timing of commissioning as it relates to a building flush admin 2012-8-10 0453 admin 2012-8-10 16:15
A new mixed-use building project in an urban area has a site area of 800,000 sq. admin 2012-8-10 02158 admin 2012-8-10 16:15
Which of the following are frequently considered types of blackwater?(choose 2) admin 2012-8-10 0266 admin 2012-8-10 09:04
What is not covered under the LEED for Core and Shell rating system?(choose 2) google 2012-8-10 02113 google 2012-8-10 09:04
Developing on a greenfield can result in:(choose 2) google 2012-8-10 01642 google 2012-8-10 09:04
Which of the following materials if reused would be considered pre-consumer recy google 2012-8-10 0857 google 2012-8-10 09:04
A project team is removing cisterns from a project design and will install a gre google 2012-8-10 0466 google 2012-8-10 09:04
What are the best design strategies for improving indoor air quality during oper google 2012-8-10 01572 google 2012-8-10 09:04
What would installing a green roof help with?(choose 2) admin 2012-8-10 0247 admin 2012-8-10 09:04
What are some of the economic benefits of green building?(choose 2) google 2012-8-10 0405 google 2012-8-10 09:04

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-20 02:09 , Processed in 0.081273 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部