LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
The sum square footage of all daylit or daylighted spaces on an NC project is 35 admin 2012-8-12 0332 admin 2012-8-12 18:42
A whole building energy simulation resulted in a baseline building performance o admin 2012-8-12 0265 admin 2012-8-12 18:42
A project for a new library has achieved 33% reduction in water use. 26% of wast admin 2012-8-12 0334 admin 2012-8-12 18:42
A school project worked with both the school board and the community to share fa google 2012-8-12 0274 google 2012-8-12 18:42
What must a Core & Shell project design include for Energy and Atmosphere Credit admin 2012-8-12 0272 admin 2012-8-12 18:42
What design decision would MOST help reduce the quantity or improve the quality admin 2012-8-12 0342 admin 2012-8-12 18:42
A project will include collecting all stormwater from the roof of the building a admin 2012-8-12 0261 admin 2012-8-12 18:42
A project team is working on a private school in a dense neighborhood averaging admin 2012-8-12 0217 admin 2012-8-12 18:42
What defines the total of the energy necessary for an entire product\\\'s lifecy admin 2012-8-12 0144 admin 2012-8-12 18:42
All HVAC&R equipment lifetimes not listed in the ASHRAE Applications handbook is admin 2012-8-12 0323 admin 2012-8-12 18:42
A project team for a school has installed many high efficiency machines such as admin 2012-8-12 0220 admin 2012-8-12 18:42
A school is letting out for the summertime. What should be done to minimize mold google 2012-8-12 0242 google 2012-8-12 18:42
Which of the following would be considered graywater? admin 2012-8-12 0315 admin 2012-8-12 18:42
What year does the Montreal Protocol finally phase out HCFCs? admin 2012-8-12 0151 admin 2012-8-12 18:42
Which of the following products would NOT qualify for Materials and Resources Cr google 2012-8-12 0277 google 2012-8-12 18:42
The project team for an elementary school did not perform a whole building simul admin 2012-8-12 0338 admin 2012-8-12 18:42
Which standard will be used to demonstrate 10% improvement in the proposed build admin 2012-8-12 0184 admin 2012-8-12 18:42
A city has mandated all new government buildings earn at least LEED silver. A LE google 2012-8-12 0275 google 2012-8-12 18:42
A Core and Shell project in Nevada has a wind energy system added to the roof. < admin 2012-8-12 0320 admin 2012-8-12 18:42
A new construction project has daylighting in 93% of required spaces. How many p admin 2012-8-12 0334 admin 2012-8-12 18:42

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 23:07 , Processed in 0.085732 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部