LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
What is the minimum percentage of occupied area that must have a direct line of admin 2012-8-30 0765 admin 2012-8-30 14:26
The Owner of a LEED Core and Shel project has decided to pursue the Tenant Desig admin 2012-8-30 0729 admin 2012-8-30 14:26
Which of the following scenarios would NOT satisfy the requirements of Sustainab admin 2012-8-30 0784 admin 2012-8-30 14:05
A small office building was found to have a surface area of 200,000 square feet admin 2012-8-30 0739 admin 2012-8-30 14:05
Which member of the project team would most likely be responsible for enforcing admin 2012-8-30 0773 admin 2012-8-30 14:05
Which of the following can contribute to credit compliance for Sustainable Sites admin 2012-8-30 0724 admin 2012-8-30 14:05
Using the CBECS database, a project team has estimated a new office building to admin 2012-8-29 0718 admin 2012-8-29 09:31
An existing LEED for New Construction project will be renovated for a new tenant admin 2012-8-29 0707 admin 2012-8-29 09:31
To meet the requirements of Indoor Environmental Quality credit, Low-Emitting Ma admin 2012-8-29 0803 admin 2012-8-29 09:31
When verifying negative pressure in designated smoking rooms, tests are conducte admin 2012-8-29 0852 admin 2012-8-29 09:31
Which of the following are NOT subject to the requirements of Energy and Atmosph admin 2012-8-29 01226 admin 2012-8-29 09:31
A project moved beyond the design phase before a green-building consultant was a admin 2012-8-28 0579 admin 2012-8-28 19:45
A mixed-use project includes office space and residential units. What energy usi admin 2012-8-28 0678 admin 2012-8-28 19:45
A project is being built on a 6 acre Greenfield site. A civil engineer has deter admin 2012-8-28 0716 admin 2012-8-28 19:45
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2012-8-28 0695 admin 2012-8-28 19:45
An owner has changed the landscaping design for a project from non-native plants admin 2012-8-28 0650 admin 2012-8-28 19:45
A project team is designing a stormwater management system to earn Sustainable S admin 2012-8-28 0717 admin 2012-8-28 19:45
What are structural strategies to reduce water pollution from stormwater for LEE admin 2012-8-28 0670 admin 2012-8-28 19:45
Which systems will contribute to earning Energy and Atmosphere Credit, On-Site R admin 2012-8-28 0597 admin 2012-8-28 19:45
LEED Technical Advisory Groups (TAGs) rule on what topics?(choose 2) admin 2012-8-28 0717 admin 2012-8-28 19:45

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-10 16:22 , Processed in 0.053867 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部