LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7703

作者 回复/查看 最后发表
WE Prerequisite 1: Water Use Reduction
Required
Intent
To increase w
admin 2012-9-1 01244 admin 2012-9-1 20:33
SS Credit 6.2: Stormwater Design—Quality Control
1 Point

Intent
admin 2012-9-1 0964 admin 2012-9-1 20:17
SS Credit 6.1: Stormwater Design—Quantity Control
1 Point

Intent <
admin 2012-9-1 01126 admin 2012-9-1 20:17
SS Credit 5.2: Site Development—Maximize Open Space
1 Point

Intent
admin 2012-9-1 0843 admin 2012-9-1 20:17
SS Credit 7.1: Heat Island Effect—Nonroof
1 Point

Intent
To re
admin 2012-9-1 01487 admin 2012-9-1 20:13
SS Credit 8: Light Pollution Reduction
1 Point

Intent
To minimi
admin 2012-9-1 01248 admin 2012-9-1 20:13
SS Credit 7.2: Heat Island Effect—Roof
1 Point

Intent
To reduc
admin 2012-9-1 0926 admin 2012-9-1 20:11
SS Credit 5.1: Site Development—Protect or Restore Habitat
1 Point
admin 2012-9-1 02136 admin 2012-9-1 19:40
A manufacturing plant has 3 non-overlapping shifts with a different number of em admin 2012-8-30 0776 admin 2012-8-30 14:27
A designer has asked you to help with a calculation for Sustainable Sites cred admin 2012-8-30 0767 admin 2012-8-30 14:27
An Owner of a future office building would like qualify for Energy and Atmospher admin 2012-8-30 0780 admin 2012-8-30 14:27
A new school is planning to install a geothermal electric system. This system wi admin 2012-8-30 0826 admin 2012-8-30 14:27
Which of the following statements is NOT the intent of Sustainable Sites credit, admin 2012-8-30 0672 admin 2012-8-30 14:27
In mechanically ventilated buildings, providing regularly occupied areas of the admin 2012-8-30 0778 admin 2012-8-30 14:27
From the results of an energy simulation conducted, a new building was found to admin 2012-8-30 0676 admin 2012-8-30 14:27
Which of the following members of the project team is most responsible for imple admin 2012-8-30 0760 admin 2012-8-30 14:27
Which of the following materials could possibly be included in calculations for admin 2012-8-30 0683 admin 2012-8-30 14:27
Which of the following estimates the true cost of a product, including original admin 2012-8-30 0777 admin 2012-8-30 14:27
A LEED for New Construction project is attempting to satisfy the requirements Wa admin 2012-8-30 0763 admin 2012-8-30 14:27
Individual lighting controls must be provided for what percentage of occupants t admin 2012-8-30 0693 admin 2012-8-30 14:27

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 13:44 , Processed in 0.046000 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部