LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
IE Q Credit 4.3: Low-Emitting Materials—Flooring Systems
1 Point

I
admin 2012-9-4 0244 admin 2012-9-4 23:17
IE Q Credit 4.2: Low-Emitting Materials—Paints and Coatings
1 Point
admin 2012-9-4 0307 admin 2012-9-4 23:17
IE Q Credit 4.1: Low-Emitting Materials—Adhesives and Sealants
1 Point
admin 2012-9-4 0197 admin 2012-9-4 23:14
IE Q Credit 3.2: Construction Indoor Air Quality Management Plan—Before
Occ
admin 2012-9-4 0287 admin 2012-9-4 23:14
IE Q Credit 3.1: Construction Indoor Air Quality Management Plan—During
Con
admin 2012-9-4 0255 admin 2012-9-4 23:14
IE Q Credit 2: Increased Ventilation
1 Point
Intent
To provide addit
admin 2012-9-4 0291 admin 2012-9-4 23:14
IE Q Credit 1: Outdoor Air Delivery Monitoring
1 Point
Intent
To pro
admin 2012-9-4 0269 admin 2012-9-4 23:14
IE Q Prerequisite 2: Environmental Tobacco Smoke (ET S) Control
Required
admin 2012-9-4 0215 admin 2012-9-4 23:11
IE Q Prerequisite 1: Minimum Indoor Air Quality Performance
Required
Int
admin 2012-9-4 0399 admin 2012-9-4 22:49
EA Credit 6: Green Power
2 Points

Intent
To encourage the devel
admin 2012-9-2 0398 admin 2012-9-2 16:10
EA Credit 5: Measurement and Verification
3 Points

Intent
To pr
admin 2012-9-2 0410 admin 2012-9-2 16:07
EA Credit 4: Enhanced Refrigerant Management
2 Points

Intent
To
admin 2012-9-2 0354 admin 2012-9-2 16:03
EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems
Requ
admin 2012-9-2 0554 admin 2012-9-2 16:03
WE Credit 2: Innovative Wastewater Technologies
2 Points

Intent
admin 2012-9-1 0354 admin 2012-9-1 20:58
Credit 3: Water Use Reduction
2–4 Points
Intent
To further increase
admin 2012-9-1 0274 admin 2012-9-1 20:57
WE Credit 1: Water Efficient Landscaping
2–4 Points

Intent
To
admin 2012-9-1 0396 admin 2012-9-1 20:48
WE Prerequisite 1: Water Use Reduction
Required
Intent
To increase w
admin 2012-9-1 0350 admin 2012-9-1 20:33
SS Credit 6.2: Stormwater Design—Quality Control
1 Point

Intent
admin 2012-9-1 0250 admin 2012-9-1 20:17
SS Credit 6.1: Stormwater Design—Quantity Control
1 Point

Intent <
admin 2012-9-1 0583 admin 2012-9-1 20:17
SS Credit 5.2: Site Development—Maximize Open Space
1 Point

Intent
admin 2012-9-1 0337 admin 2012-9-1 20:17

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-28 04:40 , Processed in 0.081617 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部