A Core and Shell building is 480,500 gross sf. The usable area of the building i admin 2012-9-29 0861 admin 2012-9-29 17:12
A project team is determining the best building site for a new school. Research google 2012-9-29 0591 google 2012-9-29 17:12
A design team is working on water use reduction strategies for a new school proj admin 2012-9-29 0637 admin 2012-9-29 17:12
A site has 100,000 sq. ft. in hardscapes, and 25,000 sq. ft. of the hardscapes h google 2012-9-29 0601 google 2012-9-29 17:12
When performing a whole building simulation for Energy and Atmosphere Credit, Op admin 2012-9-29 0593 admin 2012-9-29 17:12
The total cost of a project is $10,000,000 (CSI divisions 2-10 only). For LEED c admin 2012-9-29 0558 admin 2012-9-29 17:12
A school project is near rural farmland. The project site was previously a retai admin 2012-9-29 0639 admin 2012-9-29 17:12
A building on a college campus has 80 full-time staff and 40 part-time staff (4 google 2012-9-29 0598 google 2012-9-29 17:12
To comply with the OPTION 2 compliance path for Sustainable Sites credit, Heat I admin 2012-9-29 0563 admin 2012-9-29 17:12
A project team is deciding on what measures to include to control soil erosion. admin 2012-9-29 0569 admin 2012-9-29 17:12
Which of the following LEED credits specifically prohibits the use of added urea admin 2012-9-29 0606 admin 2012-9-29 17:12
A project team is attempting to satisfy the requirements of Sustainable Sites cr admin 2012-9-29 0585 admin 2012-9-29 17:12
BMPs used to treat runoff must be capable of removing: google 2012-9-29 0566 google 2012-9-29 17:12
A new building is estimated to have an annual energy cost of $100,000. What is t admin 2012-9-29 0645 admin 2012-9-29 17:12
When calculating a building’s baseline energy consumption, process loads can be admin 2012-9-29 0643 admin 2012-9-29 17:12
What variable accounts for the water needs by different plant species? admin 2012-9-29 0729 admin 2012-9-29 17:12
An early design of a building includes a fire suppression system containing Halo admin 2012-9-29 0900 admin 2012-9-29 17:12
Whick of the following are NOT compliance OPTIONS for Indoor Environmental Quali admin 2012-9-29 0693 admin 2012-9-29 13:32
hich of the following can affect calculations for Water Efficient Landscaping? ( admin 2012-9-29 0563 admin 2012-9-29 13:32
A project team is looking to earn as many LEED points as possible by taking adva admin 2012-9-29 0592 admin 2012-9-29 13:32

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-11-28 15:01 , Processed in 0.057592 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部