LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
A new 24-hour veterinary clinic is being built in a neighborhood business distri admin 2012-9-29 0628 admin 2012-9-29 17:18
Which of the following materials does LEED recoginze as a rapidly renewable mate admin 2012-9-29 0566 admin 2012-9-29 17:18
What should be included in a construction waste management plan for the demoliti admin 2012-9-29 0625 admin 2012-9-29 17:18
A small office building has been determined to have 100 FTE occupants. The build admin 2012-9-29 0632 admin 2012-9-29 17:18
A school has a calculated baseline water usage of 100,000 gallons. The designer admin 2012-9-29 0604 admin 2012-9-29 17:18
A new commercial building is planning to build a parking lot, what MUST be done admin 2012-9-29 0643 admin 2012-9-29 17:18
Neighborhood homeowners are meeting with the school board to discuss sharing som google 2012-9-29 0850 google 2012-9-29 17:18
A design team is considering adding a vegetated roof to a building. Which of the admin 2012-9-29 0592 admin 2012-9-29 17:17
Which of the following would satisfy the requirements of Water Efficiency credit admin 2012-9-29 0667 admin 2012-9-29 17:17
A project team is reviewing strategies for retaining stormwater on site for a pr admin 2012-9-29 0601 admin 2012-9-29 17:17
Which of the following would be included in the submittal documentation for Indo admin 2012-9-29 0613 admin 2012-9-29 17:17
What renewable energy systems are not eligible for Energy and Atmosphere Credit, admin 2012-9-29 0607 admin 2012-9-29 17:17
project team is planning to use green power obtained from a separate campus faci google 2012-9-29 0629 google 2012-9-29 17:17
Which LEED categories could potentially be affected by altering a building\\\'s admin 2012-9-29 0572 admin 2012-9-29 17:17
What statement is true regarding a passive cooling system? admin 2012-9-29 0601 admin 2012-9-29 17:17
A project team would like to earn an exemplary performance point for using 100% admin 2012-9-29 0574 admin 2012-9-29 17:17
A project team would like to include a building’s ceiling tiles in calculations admin 2012-9-29 0607 admin 2012-9-29 17:17
The mechanical engineer, working on a new office building, has designed the HVAC admin 2012-9-29 0554 admin 2012-9-29 17:17
How many points is a LEED Core and Shell project eligible for under the Sustaina admin 2012-9-29 0608 admin 2012-9-29 17:17
Which of the following is a requirement for exterior smoking areas of LEED certi admin 2012-9-29 0561 admin 2012-9-29 17:17

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-11 05:41 , Processed in 0.065667 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部