LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
For the purposes of calculating recycled content, what assumptions can be made a admin 2012-10-23 0723 admin 2012-10-23 14:24
Glare control is most often a concern associated with which of the following cre admin 2012-10-23 0618 admin 2012-10-23 14:24
A project has a materials cost of $2,000,000. What is the minimum amount of mate admin 2012-10-23 0589 admin 2012-10-23 14:24
How can the additional energy needed for increasing the ventilation in a buildin admin 2012-10-23 0602 admin 2012-10-23 14:24
A new college campus building will have 20 full time staff (8 hr/day) and 4 part admin 2012-10-23 0581 admin 2012-10-23 14:24
An existing building is undergoing a major renovation. The annual baseline energ admin 2012-10-23 0585 admin 2012-10-23 14:24
When calculating the Landscape Coefficient, what variable accounts for the numbe admin 2012-10-23 0637 admin 2012-10-23 14:24
Which of the following is NOT an option for achieving Sustainable Sites credit, admin 2012-10-23 0675 admin 2012-10-23 14:24
Which standard will be used to demonstrate a 10% improvement in the proposed bui admin 2012-10-23 0727 admin 2012-10-23 14:24
A school project has a site development density of 130,000 SF/acre in an area th admin 2012-10-23 0653 admin 2012-10-23 14:24
Which of the following are requirements of Indoor Environmental Quality credit, admin 2012-10-23 0552 admin 2012-10-23 14:24
A manufacturing plant will install solar car ports in the parking lot to generat google 2012-10-23 0556 google 2012-10-23 14:24
Which two of the following are options for achieving Sustainable Sites credit, A admin 2012-10-23 0556 admin 2012-10-23 14:24
A project team is using cotton insulation that is grown and manufactured 400 mil admin 2012-10-23 0582 admin 2012-10-23 14:24
A new office building has a baseline annual energy usage of $280,000. The proj admin 2012-10-23 0555 admin 2012-10-23 14:24
A school project team doing a renovation of a historic school is using the perfo admin 2012-10-23 0629 admin 2012-10-23 14:24
As it pertains to all LEED credits, when should a building’s occupancy be measu admin 2012-10-23 0620 admin 2012-10-23 14:24
A baseline analysis was performed and a building was found to potentially use 1, admin 2012-10-23 0562 admin 2012-10-23 14:24
A project will use FSC Pure wood for all wood on the project. Who is not require google 2012-10-23 0557 google 2012-10-23 14:24
Which of the following scenarios would NOT directly contribute to a project earn admin 2012-10-23 0608 admin 2012-10-23 14:24

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-9-11 10:49 , Processed in 0.045731 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部